| Station Name: | Capreol | ||
| Subdivision: | Alderdale | Ruel | Sudbury |
| Mileage: | 144.8 | 0.0 | 129.0 |
| Station Symbols: | C*KWYZ | CKWY | CKWY |
| Train Order: | DN | ||
| Office Signals: | CA | ||
| Sidings: | Yard | Yard | Yard |
| Other Tracks: | Yard | Yard | Yard |
| Yard Limit Boards: | 8505 feet East of Station | ||
| Location: | Capreol (County, Township) |
||
| HSMBC Report: | RSR-286 | ||
| Designation / Year: | / | ||
*Coal and diesel oil.
First track in front of station is the Sudbury Subdivision main track.
Train No. 1 will arrive and leave and No. 52 will leave on second track in front of the station. This track to be known as Alderdale Subdivision main track to first cross-over switch West of Capreol station.
Train No. 2 will arrive on the first track in front of the station, unless otherwise instructed, and will leave on the track on which is arrives.
Position of junction switch, Sudbury and Alderdale Subdivision is normal when set for main track Capreol to South Parry.
Westward passenger trains occupying main track Capreol will stop clear of first crossover switch located west of station when making station stop.
| Date | Event |
|---|
| Date | Image | Notes |
|---|---|---|
| 1960-09 | CN Photo Collection / CSTM / Image 1040 |
Station. |
| Date | Reference | Railway | Subject | Description |
|---|---|---|---|---|
| 1913-08-07 | NAC / Col. RG30M Acc. 78903/42 Item 130 | CNR | Proposed machine shop and boiler room. | Elevations. |
| 1917-09-01 | NAC / Col. RG30M Acc. 78903/42 Item 131 | CNR | YMCA building | Roof framing plan. |
| 1917-09-01 | NAC / Col. RG30M Acc. 78903/42 Item 132 | CNR | YMCA building | Ground floor plan. Framing plan. Bearings detail. |